Putting VIR back to set up
If you are asked to put a VIR back to ‘Setup’ after its status has been moved into ‘Create VIR’ or other category please ensure the following checks are carried out:
- Check if the TIF or RIF has been completed (if so, liaise with the IC)
- Download any documentation from the Inspection docs area or Provider area that may have been uploaded to ensure they can be re-uploaded once the VIR is re-create
As a first check no matter at what stage, you should always check if any of the TIFs/RIFs have been completed – if they have, liaise with the inspector/lead inspector to ensure information is not lost.